The project, with a 1.8km approach jetty and transfer tower platform, wharf, wharf conveyor including the drive and take up tower, berthing an mooring dolphins, ship access platforms, jetty conveyor and transfer tower associated with Wiggins Island Coal Export Terminal’s (WICET) Project in Gladstone. The export facility was designed to assist in satisfying global demand for thermal and metallurgical coat. The new terminal is at Golding Point, to the west of the existing RG Tanna terminal in Gladstone.
As a part of the project, HMI was awarded the contract for construction and mobilisation of the 280 tonne Canti Traveller.
Client: SMIT Lamnalco Towage
Back to Back dockings in accordance to our clients schedule
Industry: Marine
Client: SMIT Lamnalco Towage
Back to Back full 5 year survey vessel dockings
Industry: Marine
Client: Lend Lease Engineering
Fabricate cantilever, fascia frames and miscellaneous structural steel works
Industry: Engineering
Client: SMIT Marine Australia
Repair works included removal and reinstatement of winches and mast, major hull repair to the affected areas including blasting and painting, internal repairs to affected cabins, scantling, bulkheads, piping, linings and lagging.
Industry: Marine
Client: Caltex
Products and Crude Wharf - Inspections, Pile Refurbishment, Rectification Works and Debris Removal
Industry: On Site Works
Client: Graincorp
Onsite Wharf Pile Repairs
Industry: On Site Works
Client: Crosana
Unique "In House" Design and Construction of 14.5m x 6.6m barge
Industry: Marine
Client: Sibelco
Onsite Repairs to Dolphins and Piles
Industry: On Site Works
Client: WE SMITH
Blasting and Coating of Autoclave Units
Industry: Engineering
Client: Toll Marine Logistics
Loading, lashing of equipment and materials onto barge
Industry: Logistics
Client: Milanco Engineering
Fabrication of a stationary base for a 42m Tower Crane
Industry: Engineering
Client: Infrabuild Recycling
Industry: Fabrication