Design and Construction of Barge

Unique "In House" Design and Construction of 14.5m x 6.6m barge

Related Projects

2015 - 5 Year Survey Dockings of “Kullaroo”, “Koongo”, “Awoonga”, “Plenty”, “Yallarm”, “Leopard” and “Flinders

Client: SMIT Lamnalco Towage

Back to Back dockings in accordance to our clients schedule

Industry: Marine

2017 - 5 Year Survey Dockings of “SL King”, “Peter Crooke” and “Harry Evans”

Client: SMIT Lamnalco Towage

Back to Back full 5 year survey vessel dockings

Industry: Marine

Structural Steel works for Kingsford Smith Drive

Client: Lend Lease Engineering

Fabricate cantilever, fascia frames and miscellaneous structural steel works

Industry: Engineering

Emergency Repair Docking "Kullaroo"

Client: SMIT Marine Australia

Repair works included removal and reinstatement of winches and mast, major hull repair to the affected areas including blasting and painting, internal repairs to affected cabins, scantling, bulkheads, piping, linings and lagging.

Industry: Marine

General Refinery, Crude and Product Wharf Maintenance Reliability Tasks

Client: Caltex

Products and Crude Wharf - Inspections, Pile Refurbishment, Rectification Works and Debris Removal

Industry: On Site Works

Wharf Pile Repairs

Client: Graincorp

Onsite Wharf Pile Repairs

Industry: On Site Works

Design and Construction of Barge

Client: Crosana

Unique "In House" Design and Construction of 14.5m x 6.6m barge

Industry: Marine

Facility Maintenance Repairs

Client: Sibelco

Onsite Repairs to Dolphins and Piles

Industry: On Site Works

Autoclave Units

Client: WE SMITH

Blasting and Coating of Autoclave Units

Industry: Engineering

Barge Load Out

Client: Toll Marine Logistics

Loading, lashing of equipment and materials onto barge

Industry: Logistics

Large Crane Tower Base

Client: Milanco Engineering

Fabrication of a stationary base for a 42m Tower Crane

Industry: Engineering

Preferred Repairer of Bins and Equipment

Client: Infrabuild Recycling

Industry: Fabrication